Commissioning

After the phase of assembly, the commissioning ensures the respect of your specifications. It includes:

  • The training of your staff (operator level, service level, automation level)
  • Final adjustments of the whole system by qualified personnel
  • Checking of electrical connections
  • Conducting of trials without product with inputs and outputs test
  • Conducting of production tests with product support
  • The minutes of final acceptance

Palamatic provides the delivery of a technical folder according to qualifications and the following documentation:

  • Design Qualification (DQ)
  • Installation Qualification
  • Operational Qualification
  • Performance Qualification
  • Factory Acceptance Test in our workshops
  • Site Acceptance Test

Sie möchten Ihre Fertigungsprozesse gestalten?

Wir haben maßgeschneiderte Lösung

Kontaktiere uns